Can tenants stay in the building during a reroof?
Often the building can remain open when roof work is divided into manageable zones and the facility agrees to access, noise, delivery, and protection plans. We coordinate tenant circulation and work hours with the property contact. If a step requires a shutdown or interior protection, the sequence states the affected area and handback point before work begins.
What happens if rain arrives while part of the roof is open?
The daily work limit is set by the crew's ability to secure the area within the forecast window. We record the temporary dry-in boundary and return to inspect it before permanent work resumes. If weather changes sooner than expected, the facility contact knows what area remains protected and who is responsible for the next check.
How do you keep dust and debris away from operating areas?
We confirm the tear-off route, chute or lowering method, staging area, and interior-sensitive zones with the facility. Each work zone has a defined boundary, and the crew removes debris without blocking tenant or emergency circulation. The daily handback identifies any route or access restriction that remains in place.
Can mechanical service continue while the reroof is underway?
It can when the schedule and roof zones are coordinated with the mechanical team. We identify units that require shutdown, lifting, or clearance, then sequence curb and flashing work so a later trade does not cut through completed membrane. The owner approves any interruption, and the handback identifies which units are available.
What should the facility receive at the end of each phase?
A usable handback names the completed roof zone, photos the tie-ins and drains, states remaining protection or restrictions, and confirms the next work area. If a concealed condition changed the scope, the approved repair and limit are recorded. That gives the next shift and the property team the same boundary to work.